Restricted Hours Noise Monitoring Results -- Evening Time and  Daytime on Public Holiday
Station M6a, Aegean Terrace
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
25-Nov-12 11:28 11:43 Cloudy 56.2 57.8 53.4 No major construction works Local traffics of Aegean Terrace According to contractor, general construction works was in process accordance to CNP.
Free-field measurement, +3dB correction.
21.1 <5 B&K 2238        S/N : 2381580 B&K 4231     S/N: 3003246
Min. 56.2
Max. 56.2
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
11-Nov-12 13:25 13:40 Sunny 61.7 65.0 55.3 No major constructin works Road Traffic noise from Shek Pai Wan Road N.A 22.5 <5 B&K 2238   S/N : 2381580 B&K 4231  S/N: 3003246
Min. 61.7
Max. 61.7
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
06-Nov-12 21:37 21:52 Fine 65.6 67.3 63.5 No outdoor construction noise Mainly traffic noise - 22.0 0.5 RION- NL31 (S/N 00603867) RION - NC73 (S/N 10997142)
20-Nov-12 21:30 21:45 Cloudy 65.2 66.8 63.2 No outdoor construction noise Mainly traffic noise - 20.0 0.5 RION- NL31 (S/N 00603867) RION - NC73 (S/N 10997142)
28-Nov-12 22:45 23:00 Hazy 67.3 69.0 64.8 No outdoor construction noise Mainly traffic noise - 19.3 <5 B&K 2238   S/N: 2381580 B&K 4231   S/N: 3003246
Min. 65.2
Max. 67.3
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
01-Nov-12 22:45 23:00 Fine 60.8 62.2 49.5 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 21.1 <5 B&K 2238  S/N : 2381580 B&K 4231  S/N: 3003246
14-Nov-12 22:45 23:00 Fine 61.5 64.9 50.4 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 23.4 <5 B&K 2238  S/N : 2381580 B&K 4231  S/N: 3003246
Min. 60.8
Max. 61.5
Restricted Hours Noise Monitoring Results -- Evening time 
Station M6a, Aegean Terrace
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
07-Nov-12 22:45 23:00 Fine 50.8 53.2 46.5 Works inside tunnel Local traffics of Aegean Terence According to contractor, general construction works was in process accordance to CNP.
Free-field measurement, +3dB correction.
23.2 <5 B&K 2238   S/N : 2381580 B&K 4231      S/N: 3003246
21-Nov-12 22:36 22:51 Foggy 50.9 52.3 46.9 Works inside tunnel Local traffics of Aegean Terence According to contractor, general construction works was in process accordance to CNP.
Free-field measurement, +3dB correction.
22.6 <5 B&K 2238   S/N : 2381580 B&K 4231      S/N: 3003246
Min. 50.8
Max. 50.9